|
|
Tank "Swings"
and Refurbs
There is intense preparation and planning that goes into
swinging a tank to a newer chassis. GTTC representatives will meet to determine
chassis needs, measure the tank dimensions, evaluate the tank and piping systems,
and then provide a detailed price proposal. Typically, the new chassis is prepped
with new PTO’s, pumps and axel location finalized ahead of time. Upon arrival the
old tank is removed and work is commenced to give a quick turn around to minimize
downtime. Feel free to give us a call so we can discuss and possibly develop a long-term
fuel upgrade plan, schedule units for swings or upgrade accordingly.
|